top of page

PAPERWORK, HANDLED

Renovation Permits in Tenerife

Every renovation on this island comes with paperwork most homeowners have never seen before — licencias, architect projects, municipal taxes. This page explains how it works. And when you're ready, we handle it with you: one point of contact, following your file from first drawing to final approval.

THE TWO WORDS THAT SHAPE EVERY RENOVATION

Obra menor or obra mayor?

Which licence your renovation needs decides the timeline, the cost, and whether an architect must sign the project. This is the first question we answer for every client.

licencia de obra menor

The lighter licence.

Non-structural works: new bathroom or kitchen in the same place, flooring, finishes

Simpler application, shorter waiting time

Usually no full architect's project required

Lower municipal costs

licencia de obra mayor

The full project.

Structural changes: removing walls, extending terraces, replacing verandas, relocating kitchens

Requires a signed architect's project (proyecto técnico)

Longer municipal review — patience is part of the plan

Municipal taxes (ICIO and tasa) apply on the works value

WHAT WE TAKE OFF YOUR PLATE

You own the home. We chase the paperwork.

We assess which licence your renovation needs, bring in the right architect, prepare the file, and follow the application through the town hall — so you always know where things stand, in your own language.

Assessment: obra menor or mayor, before anything is planned

Architect coordination — drawings, the technical project, and every signature

Application preparation and submission at the ayuntamiento

Follow-up until approval, with clear updates along the way

Community of owners: we flag when their authorisation is needed, and help prepare it

One thing we're always transparent about: under Spanish law, the permit is granted to you as the owner, and architect fees and municipal taxes are separate cost lines from our fee.

architectural-plans-build-permit-obra-mayor-menor.jpeg

ICIO, tasa, and the architect.

Three costs travel with a permit, and none of them are ours: the ICIO (a municipal tax on the value of the works), the tasa (the town hall's processing fee), and the architect's fee for the technical project. We list them separately in every plan, estimate them honestly upfront, and never mark them up.

If you have doubts.

Contact us for more information specific to your project.

Arbe-Blog

Read more: the town hall costs nobody mentions upfront →

Frequently asked questions

ONE POINT OF CONTACT

Nothing lost in translation.

Tell us what you want to change, and we'll tell you which licence it needs — honestly, and before anything is planned.

imagiustudio B&L-1020340.jpg
bottom of page